THE LNG REGASIFICATION PLANT – KEY DATA

  1. Capacity 8 bcm/yr, easily expandable up to 12 bcm/yr
    (Italy’s annual consumption is about 83 bcm)
  2. 2 cryogenic storage tanks (+1 future)
  3. Unloading capacity of the offshore platform entails a full discharge in 14 hours from 140,000 cm net capacity sea carriers
  4. Subsea pipeline connecting the terminal in Albania with the Italian network and future interconnection with the Albanian grid
  5. Self sufficient in power generation with possible power export to the Albanian distribution grid
The construction period of the LNG plant will require hundreds of full time workers and technicians, reaching up to 1000 workers during the peak. Circa 130 workers will be employed during the production phase

 